Public records library26-598 › Park Valley ENGINEERING MEMO.pdf

Request 26-598

Park Valley ENGINEERING MEMO.pdf

PDF · 44 KB · released by the City of Moscow on request 26-598

The original PDF opens in a new tab. Open the PDF.

SHA-256 8489dc7ef0e3e59795c8bb0cde890f5a7eee2a3bfebc5b6291c29209eddc627c

Extracted text

Machine-extracted text layer of the file above, shown verbatim for search and reading. Tables and slides lose their layout. The original file governs.

# Park Valley ENGINEERING MEMO.pdf
- path: - path: Park Valley ENGINEERING MEMO.pdf
- type: pdf
- size: 44329 bytes
- pages: 1
- extraction method: text layer (pypdf)

--- Page 1 ---
Memo 
To: Michael Ray, Planning Manager 
From: Bob Buvel, Senior Civil Engineer 
CC:  Jennifer Fleischman, Administrative Assistant 
Date: 2025-08-07 
Re: Engineering Review of the Park Valley Addition Preliminary Re-plat 
 
 
Upon reviewing the preliminary re-plat for the Park  Valley Replat, the Engineering Department 
has the following recommendations: 
 
 
1) Extension of Sutton Roadway and water main to Ro binson Park Roadway and 
watermain should be required as it was with the Southgate Subdivision. 
 
2) For the pathway shown between lots 3 and 4 on bl ock 1, we recommend a 10’ pathway 
be constructed per City Standard Drawing No. 7. 
 
3) Castleford and Grandville Streets sections shoul d match City of Moscow STD DWG 1a.  
The City Engineer agrees to allow the 5’ green strip. 
 
 
  
 
This concludes our comments for this preliminary application. Please let me know if you have 
any questions or comments. 
 
Regards, 
Bob Buvel 
City of Moscow 
Engineering Dept.
Follow the campaign