Public records library26-598 › Park Valley ENGINEERING MEMO.docx

Request 26-598

Park Valley ENGINEERING MEMO.docx

Word · 20 KB · released by the City of Moscow on request 26-598

Word file. Download it to open in the matching program.

SHA-256 2e0e5153f8896f0e73826fc90c2fe8bbb708904ecd84d17450ac34235402f7b2

Extracted text

Machine-extracted text layer of the file above, shown verbatim for search and reading. Tables and slides lose their layout. The original file governs.

# Park Valley ENGINEERING MEMO.docx
- path: - path: Park Valley ENGINEERING MEMO.docx
- type: docx
- size: 20121 bytes
- extraction method: docx (python-docx)



Memo
To:	Michael Ray, Assistant Community Development Director
From:	Bob Buvel Senior Civil Engineer
cc:
Date:	2025-08-07
Re:	Department Review of the Park Valley Addition Preliminary Re-plat


Upon reviewing the preliminary re-plat for the Park Valley Addition, the engineering department has the following recommendations:


Extension of the Sutton Roadway and water main to the Robinson Park Roadway and watermain should be required as it was with the Southgate Subdivision.

For the pathway shown between lots 3 and 4 on block 1, we recommend a 10’ pathway be constructed per City Standard Drawing No. 7.

Castleford and Grandville Streets sections should match City of Moscow STD DWG 1a.  The City Engineer agrees to allow the 5’ Green strip.


		
This concludes our comments for this preliminary application. Please let me know if you have any questions or comments.

Regards, Bob Buvel