Public records library › 26-555 › 10_08_2026_mray@ci.moscow.id.us_RE_ estimated land inventory.pdf
Request 26-555 · Production 1, released September 30, 2026
10_08_2026_mray@ci.moscow.id.us_RE_ estimated land inventory.pdf
PDF · 10.2 MB · released by the City of Moscow on request 26-555
The original PDF opens in a new tab. Open the PDF.
SHA-256 33ba5572edf97bd9c0053386fcb77de8c4fd864d76a2f185d05a8a66bbd550bc
Extracted text
Machine-extracted text layer of the file above, shown verbatim for search and reading. Tables and slides lose their layout. The original file governs.
# 10_08_2026_mray@ci.moscow.id.us_RE_ estimated land inventory.pdf - path: 10_08_2026_mray@ci.moscow.id.us_RE_ estimated land inventory.pdf - type: PDF - pages/slides/sheets: 41 - extraction method: text layer - unreadable pages: 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26, 28, 30, 32 ## Page 1 Sent: 8/10/2026 4:30:49 PM From: Michael Ray <mray@ci.moscow.id.us To: "Nichoel Baird Spencer" Cc: Bcc: Importance: Normal Subject: RE: estimated land inventory Attachments : Illustrative Final Updated.pdf ,estimated residential land inventory (002) mr.pdf ,TO #2 Eddington Development Modeling Analysis TM DRAFT 2021-11-19(002) mr.pdf Nichoel, generally I think the ranges which are listed are fine, but it might also be good to list commonly observed estimates. For instance, the multi-family lots typically average around 24 units/acre. Attached is a document that I created back in 2010 which lists net and gross density for different types of subdivisions throughout Moscow. We could list a typical density based upon the acreage if it would be helpful to try to narrow it down further. Attached are my comments on the land inventory and Edington modeling. Thanks, Mike Mike Ray, AICP Planning Manager City of Moscow 504 S. Washington Street Moscow, ID 83843 mray@ci.moscow.id.us (208) 883-7008 Disclaimer: The information provided is for general informational purposes only based on the limited information provided and is not provided in lieu of the formal application, review, and permitting process as required per Moscow City Code. The City retains the right to review all applications for compliance with City, Idaho Code, and other standards at the time of submittal of a formal application and prior to the issuance of permits for the site. The information provided is intended to help individuals understand the City process, requirements, and potential impacts of a site-specific use. The City’s informal review does not constitute a substitute for consulting a qualified attorney, engineer, or planning professional for your specific situation and does not take the place of the formal application, review and permitting process. From: Nichoel Baird Spencer <nspencer@ci.moscow.id.us> Sent: Wednesday, August 5, 2026 9:50 AM To: Michael Ray <mray@ci.moscow.id.us> Subject: FW: estimated land inventory Mike, Can you review this information for me? I think the planned (AOI w/Residential designation) is correct on page 3/map but doesn’t reflect on the table on page 2. I am not sure why they are different. Similarly with Annexed/Potential on page 2 and the map and table on page 4. Finally, Can you look at the Eddington modeling and refine the numbers a bit. Thanks! ## Page 2 From: Lucy Falcy <lfalcy@ci.moscow.id.us> Sent: Tuesday, August 4, 2026 12:01 PM To: Nichoel Baird Spencer <nspencer@ci.moscow.id.us> Subject: estimated land inventory Nichoel, I hope this works for you. Lucy ## Page 3 ILLUSTRATIVE GUIDE TO City of Moscow Community Development Dept 221 E Second Street Moscow | ID | 83843 www.ci.moscow.id.us 2010 An illustrated analysis of: Christopher’s Crossing Addition Pheasant Run Addition Ridgeview Estates Addition Rolling Hills 7th Addition Quail Run 2nd Addition The Villages McGregor’s 2nd Addition Fort Russell Neighborhood Camden Ct Planned Unit Development Green Acres Planned Unit Development Tiempo Commons Planned Unit Development Peterson’s 1st Addition DENSITY ## Page 4 Introduction This illustrated guide is provided to assist the Planning and Zoning Commission and public in visualizing residential development densities, either in the number of dwelling units per acre or persons per acre, present within select examples of existing developments and neighborhood within the City of Moscow across the spectrum of low to high densities. The guide provides an inventory of existing land uses, aerial photos of the neighborhood, as well as street view photo- graphs that capture the neighborhood character. Glossary of Terms Acre – 43,560 square feet Gross Density – measure of total dwelling units within the study area per acre including public streets, alleys and other public spaces that exist outside the individual building lots. Net Density – measure of total dwelling units within the study area excluding land area outside of the individual building lots (such as streets and alleys). Population Density – measure of the total number of persons expected to reside within the study area assuming an average household size of 2.25 persons per dwelling unit as observed during the 2000 Census. du/a – dwelling units per acre p/a – persons per acre du – dwelling unit sq ft – square feet ## Page 5 Net Density Gross Density Page 2 Population Density Christopher’s Crossing Addition Year: 2000 Total Units: 17 du Study Area: 18.9 acres Use(s): Single Family 1.05 du/a .89 du/a 2.00 p/a ## Page 6 (This page has no text layer. Open the original PDF to view it.) ## Page 7 Net Density Gross Density Page 4 Population Density Pheasant Run Addition Year: 1995 Total Units: 9 du Study Area: 9.84 acres Use(s): Single Family 1.04 du/a .91 du/a 2.04 p/a ## Page 8 (This page has no text layer. Open the original PDF to view it.) ## Page 9 Net Density Gross Density Page 6 Population Density Ridgeview Estates Addition Year: 1987 Total Units: 26 du Study Area: 14.08 acres Use(s): Single Family 2.14 du/a 1.84 du/a 4.14 p/a ## Page 10 (This page has no text layer. Open the original PDF to view it.) ## Page 11 Net Density Gross Density Page 8 Population Density Rolling Hills 7th Addition Year: 2005 Total Units: 63 du Study Area: 21.30 acres Use(s): Single Family 3.68 du/a 2.95 du/a 6.63 p/a ## Page 12 (This page has no text layer. Open the original PDF to view it.) ## Page 13 Net Density Gross Density Page 10 Population Density Quail Run 2nd Addition Year: 1999 Total Units: 37 du Study Area: 11.03 acres Use(s): Single Family 3.76 du/a 3.35 du/a 7.53 p/a ## Page 14 (This page has no text layer. Open the original PDF to view it.) ## Page 15 Net Density Gross Density Page 12 Population Density Villages (Re-plat of Southgate 3rd) Year: 2005 Total Units: 22 du Study Area: 5.27 acres Use(s): Single Family Average Lot Size: Minimum: 6,002 sf Maximum: 8,804 sf Mean: 6,272 sf 6.94 du/a 4.17 du/a 9.38 p/a ## Page 16 (This page has no text layer. Open the original PDF to view it.) ## Page 17 Net Density Gross Density Page 14 Population Density McGregor’s 2nd Addition Year: 1889 Total Units: 284 du Study Area: 56.29 acres Use(s): Single Family Two Family Multi Family Average Lot Size: Minimum: 1,650 sf Maximum: 42,422 sf Mean: 9,300 sf 6.69 du/a 5.04 du/a 11.34 p/a ## Page 18 (This page has no text layer. Open the original PDF to view it.) ## Page 19 Net Density Gross Density Page 16 Population Density Fort Russell Neighborhood Year: 1882 (Approx.) Total Units: 314 du Study Area: 85.59 acres Use(s): Single Family Two Family Multi Family Institutional Average Lot Size: Minimum: 1,875 sf Maximum: 22,801 sf Mean: 7,634 sf 7.23 du/a 3.66 du/a 8.23 p/a ## Page 20 (This page has no text layer. Open the original PDF to view it.) ## Page 21 Net Density Gross Density Page 18 Population Density Camden Ct Planned Unit Development Year: 2006 Total Units: 13 du Study Area: 92,543 sq ft Use(s): Single Family Average Lot Size: Minimum: 5,061 sf Maximum: 6,814 sf Mean: 5,663 sf 7.69 du/a 6.11 du/a 13.74 p/a ## Page 22 (This page has no text layer. Open the original PDF to view it.) ## Page 23 Net Density Gross Density Page 20 Population Density Green Acres Planned Unit Development Year: 2007 Total Units: 43 du Study Area: 229,209 sq ft Use(s): Single Family Average Lot Size: Minimum: 1,549 sf Maximum: 2,325 sf Mean: 2,000 sf 21.8 du/a 8.17 du/a 18.38 p/a ## Page 24 (This page has no text layer. Open the original PDF to view it.) ## Page 25 Net Density Gross Density Page 22 Population Density Tiempo Commons Planned Unit Development Year: 2007 Total Units: 50 du Study Area: 5.5 acres Use(s): Single Family Average Lot Size: Minimum: 1,583 sf Maximum: 3,266 sf Mean: 2,033 sf 21.4 du/a 8.94 du/a 20.11 p/a ## Page 26 (This page has no text layer. Open the original PDF to view it.) ## Page 27 Net Density Gross Density Page 24 Population Density Peterson’s 1st Addition Year: 2003 Total Units: 265 du Study Area: 11.9 acres Use(s): Multi Family 24.7 du/a 22.2 du/a 49.95 p/a ## Page 28 (This page has no text layer. Open the original PDF to view it.) ## Page 29 Net Density Gross Density Page 26 Population Density 8.78 du/a Total Units: 66 du Study Area: 12.2 acres Use(s): Single Family Two Family Multi Family Average Lot Size: Minimum: 3,920 sf Maximum: 12,499 sf Mean: 7,113 sf 5.4 du/a 12.15 p/a ## Page 30 (This page has no text layer. Open the original PDF to view it.) ## Page 31 Net Density Gross Density Page 28 Population Density Total Units: 80 du Study Area: 21.5 acres Use(s): Single Family Two Family Average Lot Size: Minimum: 6,499 sf Maximum: 24,218 sf Mean: 9,360 sf 4.89 du/a 3.72 du/a 8.37 p/a ## Page 32 (This page has no text layer. Open the original PDF to view it.) ## Page 33 City of Moscow Residential Lot Inventory Construction Ready: Lots ready for building permits (can pull a building permit) Single Family Undeveloped Lots Miller Ridge (Pope's Third) 4 Southgate 1st 2 Southgate 2nd 2 Indian Hills 6th 3 Indian Hills 6th Replat 1 Indian Hills 9th 5 Woodbury 1st Addition 54 Paradise View Addition 11 Anderson 1st Addition 6 Indian Hills 7th 1 Meadow Brook 2nd Addition 12 Southgate 3rd Addition 34 Rolling Hills 8th Addition 2 Rolling Hills 10th Addition 4 White Acres 1 Edington 1st Addition 35 Anderson 7th Addition (Sunnyside) 0 Ridgeview Estates 2nd Addition 3 Quail Run Replat 1 University Gateway on 6th 27 Single Family Subtotal 208 Two-Family Undeveloped Lots Quail Run Replat 3 Popes Third 4 Subtotal 7 Multi-Family Undeveloped Lots Jabora White Ave Property 0 Southgate 1 Indian Hills 8th 1 Popes Third 6 Subtotal 8 ## Page 34 Entitled: Acres & Units Entitled as residential (Final plat or Pending final plat) Single Family Undeveloped Lots Peterson 2nd Addition 64 Sierra Vista 8 Park Valley 12 Pine View 40 Urban Berm Addition (townhouses) 8 Wildrose Court PUD 16 Subtotal 148 Two-Family Undeveloped Lots Peterson 2nd Addition, R-3, 7000sq ft-17800 sq ft lots, wide density range available within zone 30 Multi-Family Potential Units (MF-SF) Augustine Ave Apartments Plat/PUD 102 Peterson 2nd Addition, 15 R-4 Lots, 6.9 acres total 48-301* End of Warbonnet Lot Division 4 R-4 lots-9.7 acres 67-423* Subtotal 217-826 *range reflects 800sq ft of lot area minimum for multi-family to 5000sq ft for single-family Partially Entitled: Acres & Units Partially entitled (PUD & Pre-Plat) Single Family Undeveloped Lots Harvest Hills 2nd Addition 64.0 Annexed/Potential: Acres Annexed and Zoned Residential but undeveloped Marineau ANX/RZ (Orchard) (Pending), 32.8 acres R-2, 11.19 acres SR 171 SFD lot potential Remaining Edington Property, 205 acres R-3 1190-3500 lot potential Planned: Acres within Area of City Impact & Residential in Comp Plan designated as Residential but undeveloped Woodbury 2nd Addition, outside of City Limits, Auto Urban Residential 190-298 lot potential Miscellaneous UI Vandal Village, students only, nearly complete 213 Dus University Gateway on 6th, condos, in review 12 DUs Almon Apartments, nearly complete 10 DUs Blum Apartments, Mtn View, last three buildings 48 DUs If we're trying to match the map not the next page, need to add Thompson, Trail, Kenworthy, Mix, Rheinghans, and UI properties ## Page 35 Planned: Area of City Impact Comprehensive Plan Designation Area of City Impact City Limits Comp Plan Designation Acres Dus Auto Urban Residential 1044 3306-5196 Suburban Residential 166 107-195 1210 3413-5391 Industrial 63 Park and Open Space 3 Rural and Agriculture 545 Suburban Commercial 7 Auto Urban Commercial 56 These areas ballooned in purple are already developed and so fragmented that I don't see really any large additional development potential U of I property, not sure if this should be included or not. ## Page 36 Other Underdeveloped Residential Lots over 2 Acres in Size Within City Limits Zoning SQ FT -20% Parameters Potential Dus R1 1191029 952823 9600sqft SFD 99 R2 1308106 1046484 7000sqft SFD 149 R3 1458705 1166964 2000sq ft townhome, 6000sq ft SFD 233-583 R4 3836583 3069266 800sqft MF, 5000sq ft SFD 613- 3836 SR 410498.7 328398 1 acre SFD 7 ## Page 37 Task Order 2 - Eddington Development Modeling Analysis 1 DRAFT Technical Memorandum - DRAFT To: Michael Parker (City of Moscow) From: David Kuhns (HDR) Date: 11/19/2021 Subject: Task Order 2 – Eddington Development Modeling Analysis Introduction A new development (Eddington) is planned on the south end of the City, west of US-95 and south of Sand Road, that will consist primarily of single family residential (SFR) properties but also potentially some mixed use and a sports field complex (see Figure 1 on page 5). The new Eddington development spans an area that includes higher elevations that cannot be directly fed from the City’s main pressure zone. The City desires to understand the infrastructure components, such as pumping and storage reservoirs, that are likely necessary for serving the Eddington development. This Task Order 2 effort involves use of the City’s existing hydraulic model to preliminarily identify the infrastructure necessary for serving the Eddington development. The results of the analysis are summarized in this technical memorandum (TM). This TM is an updated analysis, specific to the Eddington development, to the South Moscow Modeling Analysis TM (6/7/2021) completed as part of Task Order 1. Forecasted Demands HDR was provided a copy of a preliminary plat of the Eddington development that shows parcel and road locations. The development consists of SFR lots, multi-family residential (MFR) townhome style lots, and a sports field complex. The plat has 429 SFR lots and 92 MFR lots. The City’s 2012 Comprehensive Water System Plan (2012 CWSP) includes typical water use factors of: • SFR average day demand = 247 gallons per day (gpd) • MFR unit average day demand = 126 gpd • Maximum day demand (MDD) to average day demand (ADD) peaking factor of 2.2 A 1.2 safety factor was also used on forecasted demands based on recommendations in the Washington Department of Health (DOH) 2020 Water System Design Manual (WSDM). The demands, excluding the sports field complex, were calculated as: • SFR ADD = 429 SFR lots × 247 gpd/SFR = 105,963 gpd = 73.6 gallons per minute (gpm) • MFR ADD = 92 MFR lots × 126 gpd/MFR = 11592 gpd = 8.1 gpm • Residential ADD = (73.6 gpm + 8.1 gpm) × 1.2 = 98 gpm, assumed 100 gpm for analysis • MDD = 100 gpm × 2.2 = 220 gpm The City provided HDR with historical water consumption for the City’s parks. Parks with sports fields include Ghormley Park, Joseph Field, and Oyler Field. Based on that data, it was found that the typical annual water consumption for this type of park is 500,000 gallons per acre with a MDD/ADD peaking factor of approximately 5. The fields part of the Eddington development have an area of approximately 28 acres. Therefore, the demands were estimated to be: • Sports field ADD = 27 gpm • Sports field MDD = 135 gpm 120 MF Units approved/anticipated 140 SF lots platted/anticipa ted 200 acres remaining, assuming 3 units/acre based upon topography/ streets would be 600 SF lots ## Page 38 Task Order 2 - Eddington Development Modeling Analysis 2 DRAFT Table 1 provides a summary of the Eddington development demands assumed in the analysis. Table 1. Assumed Eddington demands Demand type Residential demand (gpm) Sports field demand (gpm) Total demand (gpm) Average day demand 100 27 127 Maximum day demand 220 135 355 Eddington Development Analysis Based on the Eddington development plat that showed parcel and road locations, the development was brought into the hydraulic model. The plat did not show utility infrastructure but it was assumed that 8-inch piping followed all the roads in the development. The development was then assumed to be supplied via 12-inch piping from the connection point to Palouse River Drive. The piping and connection points are shown on Figure 1. The Eddington development has a significant change in elevation with the northern part of the development at an elevation of approximately 2,540 feet and the highest elevation at the south end of the development at an elevation of approximately 2,920 feet; resulting in a 380 foot difference. The Main Pressure Zone of the City has a hydraulic grade line (HGL) elevation of approximately 2,790 feet. Therefore, a portion of the development will require a booster pump station to provide water supply. The 380 foot difference is equivalent to a pressure difference of 165 pounds per square inch (psi). Assuming an acceptable minimum pressure of 40 psi during typical demand conditions, 20 psi during fire flow conditions, and a maximum pressure of 100 psi; and given the current road configuration of the development, a preliminary layout of the development’s water system was prepared that included four different pressure zones, including an area that can be fed directly from the Main Pressure Zone. These zones include: • Eddington Main Pressure Zone • Eddington 2815 Zone • Eddington 2924 Zone • Eddington 3020 Zone Figure 1 shows the approximate boundaries assumed for the pressure zones. The Eddington Booster Pump Station (BPS) would boost water from the Eddington Main Pressure Zone (which is directly connected to the Main Pressure Zone from a connection to Palouse River Drive) to the Eddington 3020 Zone. The Eddington 2924 and 2815 Zones would be supplied from the Eddington 3020 Zone (and the Eddington BPS) through pressure reducing valves (PRVs). Given the current assumed boundaries, 290 SFR parcels would be served by the Eddington BPS. Closed Pressure Zone If the Eddington development has no storage tank, the Eddington BPS would be serving a closed pressure zone and would need to be sized to supply the fire flow goal (1,500 gpm) plus the peak hour demand. The demands of the boosted area (290 SFR parcels) and pump station minimum capacity are given in Table 2. Given a closed pressure zone configuration, the Eddington BPS would need a minimum pumping capacity of at least 1,803 gpm with the largest pump offline. ## Page 39 Task Order 2 - Eddington Development Modeling Analysis 3 DRAFT Table 2. Closed pressure zone Eddington BPS capacity analysis Demand type Demand (gpm) Boosted area average day demand 60 Boosted area maximum day demand 132 Boosted area peak hour demand 303 Fire flow demand 1,500 Minimum pumping capacity with largest pump offline (peak hour demand + fire flow demand) 1,803 A preliminary location for the Eddington BPS was identified. At this location, pressures remain adequate on the suction side of the pump station. The peak pressure on the discharge side of the pump station (start of the transmission main) is approximately 180 psi. At the end of the transmission pipe where the pipe connects to the Eddington 3020 Zone, the pressure is about 80 psi. Open Pressure Zone If the Eddington development included a storage tank (connected to the Eddington 3020 Zone (open pressure zone) and sized to serve the boosted zones, the Eddington BPS would need to be sized to supply the maximum day demand. The demands of the boosted area (290 SFR parcels) and pump station minimum capacity are given in Table 3. Given an open pressure zone configuration, the Eddington BPS would need a minimum pumping capacity of at least 132 gpm with all pumps online. Table 3. Open pressure zone Eddington BPS capacity analysis Demand type Demand (gpm) Boosted area average day demand 60 Boosted area maximum day demand 132 Minimum pumping capacity with all pumps online 132 A storage capacity analysis was completed to determine the necessary tank geometry based off the required storage components in Table 4. Table 4. Required storage components Storage Volume (gallons) Operational storage (assuming 2 foot operating band) 7,344 Equalization storage (assuming 132 gpm capacity pump station) 25,650 Standby storage (assuming 8 hours of average day demand) 28,800 Fire suppression storage (assuming 1,500 gpm x 2 hours) 180,000 The actual tank geometry (diameter and height) varies depending on the pressure being provided to the highest service connection in the Eddington 3020 Zone. Table 5 provides a range of potential tank geometry to meet the storage needs in Table 4. The tank geometry assumes a circular standpipe style tank with a base elevation at the same elevation of the highest service connection. A pressure for a filled tank at the highest service connection of 50 psi results in the lowest tank surface area if optimizing the tank surface area to be a minimum (lowest material quantity). This is equivalent to a 24.4 diameter, 0.4 million gallon tank. ## Page 40 Task Order 2 - Eddington Development Modeling Analysis 4 DRAFT Table 5. Range of potential tank geometry Pressure for filled tank at highest service elevation (psi) Tank overflow elevation (ft) Tank Height (ft) Tank Diameter (ft) Total Internal Volume (gal) Tank surface area (sft) 80 3,105.64 185.6 17.1 318,899 10,432 70 3,082.56 162.6 18.8 336,086 10,133 60 3,059.48 139.5 21.0 362,058 9,904 50 3,036.40 116.4 24.4 405,859 9,841 45 3,024.86 104.9 26.8 441,372 9,943 44 3,022.55 102.6 27.3 450,317 9,982 43 3,020.24 100.2 29.8 522,191 10,770 42 3,019.32 99.3 33.0 636,559 12,019 41 3,015.63 95.6 119.1 7,964,356 58,036 Fire Flow Results Assuming a closed pressure zone configuration, the piping shown on Figure 1, and 2030 forecasted maximum day demand, the available fire flow was calculated for the Eddington development. The available fire flow is subject to a constraint of maintaining at least a pressure of 20 psi throughout the distribution system. While the water system does not have a maximum velocity constraint, a constraint of 10 feet per second was also applied for piping within the development (but not applied to existing piping outside of the development). It was determined that available fire flow is currently limited by the high point in the existing distribution system near Cayuse Drive and Conestoga Street. This pressure constraint is reduced assuming that the check valve at the intersection of Conestoga Street and Appaloosa Road is removed, allowing looped flow of the Main Pressure Zone through that intersection. As the City plans on completing an improvement to remove that check valve and allow looped flow through that intersection, the fire flow analysis assumes that check valve is removed. The analysis also found that some segments of 10-inch pipe were necessary to maintain adequate pressure in certain areas during fire flow. The available fire flow given the above assumptions is shown on Figure 1. Note that while the fire flow goal of 1,500 gpm is met for all SFR locations, the MFR locations at the northwest corner of the Eddington development is limited to 1,850 gpm which is below the MFR fire flow goal of 4,250 gpm contained in the Water System Plan. Additional improvements to the water system are necessary to improve flows into the South Moscow area if a higher fire flow is needed that what is currently available, which could consist of a combination of piping improvements and additional storage at the south part of the system. Summary The Eddington development will require a booster pump station to achieve adequate pressures at the higher elevations of the development which could consist of using a series of pressure zones divided by PRVs with a booster pump station supplying the higher zones (see Figure 1). The lower parts of the development can be supplied directly from the Main Pressure Zone via a connection on Palouse River Drive. The available fire flow for the development is approximately 1,500 gpm to 1,850 gpm given 2030 maximum day demand and is limited by capacity of flows into the South Moscow area. ## Page 41 1851 gpm 1857 gpm 1857 gpm 1860 gpm 1851 gpm 1852 gpm 1810 gpm 1559 gpm 1860 gpm 1542 gpm 1544 gpm 1853 gpm 1857 gpm 1567 gpm 1567 gpm 1856 gpm 1856 gpm 1857 gpm 1567 gpm 1853 gpm 1858 gpm 1852 gpm 1857 gpm 1563 gpm 1562 gpm 1842 gpm 1854 gpm 1853 gpm 1857 gpm 1851 gpm 1854 gpm 1853 gpm 1850 gpm 1567 gpm 1840 gpm 1857 gpm 1858 gpm 1855 gpm 1852 gpm 1850 gpm 1852 gpm 1852 gpm 1564 gpm 1851 gpm 1564 gpm 1858 gpm 1850 gpm EDDINGTON DEVELOPMENT FIGURE 1 TASK ORDER 2 - EDDINGTON DEVELOPMENT MODELING ANALYSIS PATH: P:\CITY_MOSCOW_201226\NW_RESERVOIR_10048301\7.2_WP\MAP_DOCS\TO2 EDDINGTON\EDDINGTON.MXD - USER: DKUHNS - DATE: 11/19/2021 0 500 Feet O Eddington Pump Station 12-inch pump station transmission pipe PRV Station PRV Station PRV Station or Normally Closed Valve Note: The layout shown is a preliminary layout of the water system and should not be considered the final layout for the system. Follow-up analysis should take place once grading and plat are finalized. Available fire flow assumes 2030 MDD, 20 psi pressure constraint, 10 fps velocity constraint within the development, and removal of the check valve at the intersection of Conestoga St and Appaloosa Rd. Connection to existing piping on Palouse River Drive Sports Complex MFR Area LEGEND Available fire flow Existing Water Main Eddington Development Eddington Development Proposed Pipes 8-inch 10-inch 12-inch Eddington Pressure Zones Eddington 2815 Eddington 2924 Eddington 3020 Eddington Main