Public records library › 26-555 › 09_06_2026_mray@ci.moscow.id.us_RE_ Changes in Duplex code.pdf

Request 26-555 · Production 1, released September 30, 2026

09_06_2026_mray@ci.moscow.id.us_RE_ Changes in Duplex code.pdf

PDF · 142 KB · released by the City of Moscow on request 26-555

The original PDF opens in a new tab. Open the PDF.

SHA-256 8e04c62234a6079bdbe8c7a56659047a458d98e998713da2fab3ea030d7ff2d0

Extracted text

Machine-extracted text layer of the file above, shown verbatim for search and reading. Tables and slides lose their layout. The original file governs.

# 09_06_2026_mray@ci.moscow.id.us_RE_ Changes in Duplex code.pdf
- path: 09_06_2026_mray@ci.moscow.id.us_RE_ Changes in Duplex code.pdf
- type: PDF
- pages/slides/sheets: 3
- extraction method: text layer
- unreadable pages: 3
## Page 1
Sent: 
6/9/2026 11:15:30 AM
From: 
Michael Ray <mray@ci.moscow.id.us
To: 
"Nichoel Baird Spencer" 
Cc: 
"Lucy Falcy" 
Bcc: 
Importance: Normal
Subject:
RE: Changes in Duplex code
Attachments:image001.png 
Thoughts?
 
That portion of a dwelling unit devoted to the preparation or cooking of food for the purpose of consumption by 
residents of the dwelling unit. Any food preparation area containing cabinetry, a countertop, and a sink which includes 
cooking facilities (i.e., stove, oven, hot plate, and/or microwave oven, or refrigerator) or with a natural gas stub or 
supply or a 220-volt electrical outlet/wiring is a kitchen for purposes of this Code.
 
Mike Ray, AICP
Planning Manager
City of Moscow
504 S. Washington Street
Moscow, ID 83843
mray@ci.moscow.id.us
(208) 883-7008
 
 
Disclaimer: The information provided is for general informational purposes only based on the limited information provided and 
is not provided in lieu of the formal application, review, and permitting process as required per Moscow City Code. The City 
retains the right to review all applications for compliance with City, Idaho Code, and other standards at the time of submittal of a 
formal application and prior to the issuance of permits for the site.   The information provided is intended to help individuals 
understand the City process, requirements, and potential impacts of a site-specific use.  The City’s informal review does not 
constitute a substitute for consulting a qualified attorney, engineer, or planning professional for your specific situation and does 
not take the place of the formal application, review and permitting process. 
 
From: Nichoel Baird Spencer <nspencer@ci.moscow.id.us> 
Sent: Wednesday, June 3, 2026 3:37 PM
To: Michael Ray <mray@ci.moscow.id.us>
Cc: Lucy Falcy <lfalcy@ci.moscow.id.us>
Subject: Changes in Duplex code 
 
Here is where we start….Lets talk when Mike is back: 
 
Kitchen. 
That portion of a dwelling devoted to the preparation or coking of food for the purpose of consumption by 
residents of the dwelling unit.  Any room or area with a combination cooking (i.e. Stove, oven, hot plate, 
burner, and/or microwave oven), food storage or assembly (i.e. counters, cabinets, storage, and/or 
refrigeration), sinks or plumbing stubs, above counter outlets, natural gas stubs, and/or 220-volt electrical 
wiring is a kitchen for the purpose of this code.  
 
Nichoel Baird Spencer, MCRP, AICP
Community Development Director/Deputy City Administrator
Email: nspencer@ci.moscow.id.us
Phone: 208-883-7027
Website: www.ci.moscow.id.us

## Page 2
 
Disclaimer: The information provided is for general informational purposes only based on the limited information provided and 
is not provided in lieu of the formal application, review, and permitting process as required per Moscow City Code. The City 
retains the right to review all applications for compliance with City, Idaho Code, and other standards at the time of submittal of a 
formal application and prior to the issuance of permits for the site.   The information provided is intended to help individuals 
understand the City process, requirements, and potential impacts of a site-specific use.  The City’s informal review does not 
constitute a substitute for consulting a qualified attorney, engineer, or planning professional for your specific situation and does 
not take the place of the formal application, review and permitting process.

## Page 3
(This page has no text layer. Open the original PDF to view it.)
Follow the campaign
Email Council